Things were pretty quiet really on the blitz front last week, but i have a few jobs which need to get done this week (and it looks like it will be hot again - mid/high 30s).
I need to fill in the wood panel sections in the wall with some fibro-cement board and paint with a textured sand finish and i need to get all of the paving up. I also need to replace some of the pavers in the driveway so it is solid black and to do the same around the back of the house in the pathway.
The girls are coming in the morning to check out the limestone and then we will work out how much needs to be ordered so i can get the wall built.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment